Browse assets
Filter 3 assets — sorted by most-overdue first. Coating status is a cycle-based prediction (e.g. tank battery ~12yr, steel bridge ~25yr) — verify last recoat with the operator. Long-lifecycle assets show "Verify with owner".
Owner: ORYX×
3 results
| Asset | Type | Owner | Location | Contact | Coating due |
|---|---|---|---|---|---|
| ORYX - CARLSBAD STATION | pipeline_liquid | ORYX | LOVING | — | Verify with owner |
| ORYX - LYNCH STATION | pipeline_liquid | ORYX | MONUMENT | — | Verify with owner |
| ORYX/PARDUE COMPRESSOR STATION | pipeline_gas | ORYX | LOVING | — | Verify with owner |
ORYX - CARLSBAD STATION
Verify with owner
pipeline_liquid· ORYX· LOVING
ORYX - LYNCH STATION
Verify with owner
pipeline_liquid· ORYX· MONUMENT
ORYX/PARDUE COMPRESSOR STATION
Verify with owner
pipeline_gas· ORYX· LOVING
1–3 of 3