Browse assets
Filter 2 assets — sorted by most-overdue first. Coating status is a cycle-based prediction (e.g. tank battery ~12yr, steel bridge ~25yr) — verify last recoat with the operator. Long-lifecycle assets show "Verify with owner".
Owner: Ares Energy Ltd×
2 results
| Asset | Type | Owner | Location | Contact | Coating due |
|---|---|---|---|---|---|
| Wood 3 #1H | Well site | Ares Energy Ltd | Andrews↗ | — | Due in 1 yr |
| University 45 #8 | Well site | Ares Energy Ltd | Andrews↗ | — | Due in 2 yr |
Wood 3 #1H
Due in 1 yr
Well site· Ares Energy Ltd· Andrews
University 45 #8
Due in 2 yr
Well site· Ares Energy Ltd· Andrews
1–2 of 2