Browse assets
Filter 4 assets — sorted by most-overdue first. Coating status is a cycle-based prediction (e.g. tank battery ~12yr, steel bridge ~25yr) — verify last recoat with the operator. Long-lifecycle assets show "Verify with owner".
Owner: PASADENA PLANT×
4 results
| Asset | Type | Owner | Location | Contact | Coating due |
|---|---|---|---|---|---|
| KETJEN LLC, PASADENA PLANT | Petrochem | — | PASADENA | — | Verify with owner |
| PASADENA PLANT | Petrochem | — | PASADENA | — | Verify with owner |
| PASADENA PLANT | Petrochem | — | PASADENA | — | Verify with owner |
| PASADENA PLANT | Petrochem | — | PASADENA | — | Verify with owner |
KETJEN LLC, PASADENA PLANT
Verify with owner
Petrochem· PASADENA
PASADENA PLANT
Verify with owner
Petrochem· PASADENA
PASADENA PLANT
Verify with owner
Petrochem· PASADENA
PASADENA PLANT
Verify with owner
Petrochem· PASADENA
1–4 of 4