Browse assets
Filter 2 assets — sorted by most-overdue first. Coating status is a cycle-based prediction (e.g. tank battery ~12yr, steel bridge ~25yr) — verify last recoat with the operator. Long-lifecycle assets show "Verify with owner".
Owner: XTO ENERGY INC×
2 results
| Asset | Type | Owner | Location | Contact | Coating due |
|---|---|---|---|---|---|
| XTO ENERGY INC / LIGON COMPRESSOR STATION | pipeline_gas | XTO ENERGY INC | STUART | — | Verify with owner |
| XTO ENERGY INC / STUART COMPRESSOR STATION | pipeline_gas | XTO ENERGY INC | ARPELAR | — | Verify with owner |
XTO ENERGY INC / LIGON COMPRESSOR STATION
Verify with owner
pipeline_gas· XTO ENERGY INC· STUART
XTO ENERGY INC / STUART COMPRESSOR STATION
Verify with owner
pipeline_gas· XTO ENERGY INC· ARPELAR
1–2 of 2