Browse assets
Filter 4 assets — sorted by most-overdue first. Coating status is a cycle-based prediction (e.g. tank battery ~12yr, steel bridge ~25yr) — verify last recoat with the operator. Long-lifecycle assets show "Verify with owner".
Owner: SOUTHERN STAR CTL G×
4 results
| Asset | Type | Owner | Location | Contact | Coating due |
|---|---|---|---|---|---|
| SOUTHERN STAR CTL G/COTTON VALLEY STA | pipeline_gas | SOUTHERN STAR CTL G | COPAN | — | Verify with owner |
| SOUTHERN STAR CTL G/MUTUAL COMPRESSOR ST | pipeline_gas | SOUTHERN STAR CTL G | MUTUAL | — | Verify with owner |
| SOUTHERN STAR CTL G/WAKITA STA | pipeline_gas | SOUTHERN STAR CTL G | WAKITA | — | Verify with owner |
| SOUTHERN STAR CTL G/WEST WEBB STA | pipeline_gas | SOUTHERN STAR CTL G | BLACKWELL | — | Verify with owner |
SOUTHERN STAR CTL G/COTTON VALLEY STA
Verify with owner
pipeline_gas· SOUTHERN STAR CTL G· COPAN
SOUTHERN STAR CTL G/MUTUAL COMPRESSOR ST
Verify with owner
pipeline_gas· SOUTHERN STAR CTL G· MUTUAL
SOUTHERN STAR CTL G/WAKITA STA
Verify with owner
pipeline_gas· SOUTHERN STAR CTL G· WAKITA
SOUTHERN STAR CTL G/WEST WEBB STA
Verify with owner
pipeline_gas· SOUTHERN STAR CTL G· BLACKWELL
1–4 of 4