Browse assets
Filter 2 assets — sorted by most-overdue first. Coating status is a cycle-based prediction (e.g. tank battery ~12yr, steel bridge ~25yr) — verify last recoat with the operator. Long-lifecycle assets show "Verify with owner".
Owner: SCISSORTAIL ENGRY LLC×
2 results
| Asset | Type | Owner | Location | Contact | Coating due |
|---|---|---|---|---|---|
| SCISSORTAIL ENGRY LLC / BIG POND STA | pipeline_gas | SCISSORTAIL ENGRY LLC | MILFAY | — | Verify with owner |
| SCISSORTAIL ENGRY LLC / SAND CREEK CMPSR STA | pipeline_gas | SCISSORTAIL ENGRY LLC | HOMINY | — | Verify with owner |
SCISSORTAIL ENGRY LLC / BIG POND STA
Verify with owner
pipeline_gas· SCISSORTAIL ENGRY LLC· MILFAY
SCISSORTAIL ENGRY LLC / SAND CREEK CMPSR STA
Verify with owner
pipeline_gas· SCISSORTAIL ENGRY LLC· HOMINY
1–2 of 2