Browse assets
Filter 2 assets — sorted by most-overdue first. Coating status is a cycle-based prediction (e.g. tank battery ~12yr, steel bridge ~25yr) — verify last recoat with the operator. Long-lifecycle assets show "Verify with owner".
Owner: PANHANDLE EASTERN P×
2 results
| Asset | Type | Owner | Location | Contact | Coating due |
|---|---|---|---|---|---|
| PANHANDLE EASTERN P/ALVA N HOPETON CMPSR | pipeline_gas | PANHANDLE EASTERN P | ALVA | — | Verify with owner |
| PANHANDLE EASTERN P/CASHION STA | pipeline_gas | PANHANDLE EASTERN P | CASHION | — | Verify with owner |
PANHANDLE EASTERN P/ALVA N HOPETON CMPSR
Verify with owner
pipeline_gas· PANHANDLE EASTERN P· ALVA
PANHANDLE EASTERN P/CASHION STA
Verify with owner
pipeline_gas· PANHANDLE EASTERN P· CASHION
1–2 of 2