Browse assets
Filter 3 assets — sorted by most-overdue first. Coating status is a cycle-based prediction (e.g. tank battery ~12yr, steel bridge ~25yr) — verify last recoat with the operator. Long-lifecycle assets show "Verify with owner".
Owner: ONEOK GAS TRANSP LL×
3 results
| Asset | Type | Owner | Location | Contact | Coating due |
|---|---|---|---|---|---|
| ONEOK GAS TRANSP LL/FARGO CITY BORDER | pipeline_gas | ONEOK GAS TRANSP LL | FARGO | — | Verify with owner |
| ONEOK GAS TRANSP LL/PURCELL CMPSR STA | pipeline_gas | ONEOK GAS TRANSP LL | PURCELL | — | Verify with owner |
| ONEOK GAS TRANSP LL/RED OAK | pipeline_gas | ONEOK GAS TRANSP LL | RED OAK | — | Verify with owner |
ONEOK GAS TRANSP LL/FARGO CITY BORDER
Verify with owner
pipeline_gas· ONEOK GAS TRANSP LL· FARGO
ONEOK GAS TRANSP LL/PURCELL CMPSR STA
Verify with owner
pipeline_gas· ONEOK GAS TRANSP LL· PURCELL
ONEOK GAS TRANSP LL/RED OAK
Verify with owner
pipeline_gas· ONEOK GAS TRANSP LL· RED OAK
1–3 of 3