Browse assets
Filter 2 assets — sorted by most-overdue first. Coating status is a cycle-based prediction (e.g. tank battery ~12yr, steel bridge ~25yr) — verify last recoat with the operator. Long-lifecycle assets show "Verify with owner".
Owner: GPM GAS×
2 results
| Asset | Type | Owner | Location | Contact | Coating due |
|---|---|---|---|---|---|
| GPM GAS/CAT 3512 TALE_______________1406 | pipeline_gas | GPM GAS | NO CITY NAME | — | Verify with owner |
| GPM GAS/EAST EDDY BOOSTER STA________407 | pipeline_gas | GPM GAS | CARLSBAD | — | Verify with owner |
GPM GAS/CAT 3512 TALE_______________1406
Verify with owner
pipeline_gas· GPM GAS· NO CITY NAME
GPM GAS/EAST EDDY BOOSTER STA________407
Verify with owner
pipeline_gas· GPM GAS· CARLSBAD
1–2 of 2