Browse assets
Filter 2 assets — sorted by most-overdue first. Coating status is a cycle-based prediction (e.g. tank battery ~12yr, steel bridge ~25yr) — verify last recoat with the operator. Long-lifecycle assets show "Verify with owner".
Owner: ENBRIDGE PIPELINES×
2 results
| Asset | Type | Owner | Location | Contact | Coating due |
|---|---|---|---|---|---|
| ENBRIDGE PIPELINES /CHEYENNE COMPRESSOR | pipeline_gas | ENBRIDGE PIPELINES | ELK CITY | — | Verify with owner |
| ENBRIDGE PIPELINES /ORYX 33 FACILITY | pipeline_gas | ENBRIDGE PIPELINES | REYDON | — | Verify with owner |
ENBRIDGE PIPELINES /CHEYENNE COMPRESSOR
Verify with owner
pipeline_gas· ENBRIDGE PIPELINES· ELK CITY
ENBRIDGE PIPELINES /ORYX 33 FACILITY
Verify with owner
pipeline_gas· ENBRIDGE PIPELINES· REYDON
1–2 of 2