Browse assets
Filter 3 assets — sorted by most-overdue first. Coating status is a cycle-based prediction (e.g. tank battery ~12yr, steel bridge ~25yr) — verify last recoat with the operator. Long-lifecycle assets show "Verify with owner".
Owner: FORMOSA POINT COMFORT PLANT×
3 results
| Asset | Type | Owner | Location | Contact | Coating due |
|---|---|---|---|---|---|
| FORMOSA POINT COMFORT PLANT | Petrochem | FORMOSA POINT COMFORT PLANT | POINT COMFORT | — | Verify with owner |
| FORMOSA POINT COMFORT PLANT | Petrochem | FORMOSA POINT COMFORT PLANT | POINT COMFORT | — | Verify with owner |
| FORMOSA POINT COMFORT PLANT | Petrochem | FORMOSA POINT COMFORT PLANT | POINT COMFORT | — | Verify with owner |
FORMOSA POINT COMFORT PLANT
Verify with owner
Petrochem· FORMOSA POINT COMFORT PLANT· POINT COMFORT
FORMOSA POINT COMFORT PLANT
Verify with owner
Petrochem· FORMOSA POINT COMFORT PLANT· POINT COMFORT
FORMOSA POINT COMFORT PLANT
Verify with owner
Petrochem· FORMOSA POINT COMFORT PLANT· POINT COMFORT
1–3 of 3