Browse assets
Filter 3 assets — sorted by most-overdue first. Coating status is a cycle-based prediction (e.g. tank battery ~12yr, steel bridge ~25yr) — verify last recoat with the operator. Long-lifecycle assets show "Verify with owner".
Owner: TENNESSEE GAS PIPELINE CO LLC×
3 results
| Asset | Type | Owner | Location | Contact | Coating due |
|---|---|---|---|---|---|
| TENNESSEE GAS PIPELINE CO LLC - COMPRESSOR STATION NO. 836A | pipeline_gas | TENNESSEE GAS PIPELINE CO LLC | CROWVILLE | — | Verify with owner |
| TENNESSEE GAS PIPELINE CO LLC - STATION 40 | pipeline_gas | TENNESSEE GAS PIPELINE CO LLC | NATCHITOCHES | — | Verify with owner |
| TENNESSEE GAS PIPELINE CO LLC - YSCLOSKEY COMPRESSOR STATION 529 | pipeline_gas | TENNESSEE GAS PIPELINE CO LLC | SAINT BERNARD | — | Verify with owner |
TENNESSEE GAS PIPELINE CO LLC - COMPRESSOR STATION NO. 836A
Verify with owner
pipeline_gas· TENNESSEE GAS PIPELINE CO LLC· CROWVILLE
TENNESSEE GAS PIPELINE CO LLC - STATION 40
Verify with owner
pipeline_gas· TENNESSEE GAS PIPELINE CO LLC· NATCHITOCHES
TENNESSEE GAS PIPELINE CO LLC - YSCLOSKEY COMPRESSOR STATION 529
Verify with owner
pipeline_gas· TENNESSEE GAS PIPELINE CO LLC· SAINT BERNARD
1–3 of 3