Browse assets
Filter 5 assets — sorted by most-overdue first. Coating status is a cycle-based prediction (e.g. tank battery ~12yr, steel bridge ~25yr) — verify last recoat with the operator. Long-lifecycle assets show "Verify with owner".
Owner: INEOS USA LLC×
5 results
| Asset | Type | Owner | Location | Contact | Coating due |
|---|---|---|---|---|---|
| INEOS USA LLC - STRATTON RIDGE FACILITY | Tank farm | — | CLUTE | ✆ Yes | Verify with owner |
| INEOS USA LLC - CHOCOLATE BAYOU PLANT | Petrochem | INEOS USA LLC | ALVIN | ✆ Yes | Verify with owner |
| INEOS USA LLC - HOBBS FRACTIONATION COMPLEX | Tank farm | INEOS USA LLC | SEMINOLE | ✆ Yes | Verify with owner |
| INEOS USA LLC: 08 AMMONIA | Pipeline | INEOS USA LLC | —↗ | ✆ Yes | Verify with owner |
| INEOS USA LLC: 09 ACRYLONITRILE | Pipeline | INEOS USA LLC | —↗ | ✆ Yes | Verify with owner |
INEOS USA LLC - STRATTON RIDGE FACILITY
Verify with owner
Tank farm· CLUTE· ✆ contact
INEOS USA LLC - CHOCOLATE BAYOU PLANT
Verify with owner
Petrochem· INEOS USA LLC· ALVIN· ✆ contact
INEOS USA LLC - HOBBS FRACTIONATION COMPLEX
Verify with owner
Tank farm· INEOS USA LLC· SEMINOLE· ✆ contact
INEOS USA LLC: 08 AMMONIA
Verify with owner
Pipeline· INEOS USA LLC· ✆ contact
INEOS USA LLC: 09 ACRYLONITRILE
Verify with owner
Pipeline· INEOS USA LLC· ✆ contact
1–5 of 5