Browse assets
Filter 2 assets — sorted by most-overdue first. Coating status is a cycle-based prediction (e.g. tank battery ~12yr, steel bridge ~25yr) — verify last recoat with the operator. Long-lifecycle assets show "Verify with owner".
Owner: KOCH METHANOL ST. JAMES LLC×
2 results
| Asset | Type | Owner | Location | Contact | Coating due |
|---|---|---|---|---|---|
| KOCH METHANOL ST. JAMES LLC - METHANOL TERMINAL | Tank farm | KOCH METHANOL ST. JAMES LLC | ST. JAMES | — | Verify with owner |
| KOCH METHANOL ST. JAMES LLC - METHANOL TERMINAL | Tank farm | KOCH METHANOL ST. JAMES LLC | SAINT JAMES | — | Verify with owner |
KOCH METHANOL ST. JAMES LLC - METHANOL TERMINAL
Verify with owner
Tank farm· KOCH METHANOL ST. JAMES LLC· ST. JAMES
KOCH METHANOL ST. JAMES LLC - METHANOL TERMINAL
Verify with owner
Tank farm· KOCH METHANOL ST. JAMES LLC· SAINT JAMES
1–2 of 2