Browse assets
Filter 5 assets — sorted by most-overdue first. Coating status is a cycle-based prediction (e.g. tank battery ~12yr, steel bridge ~25yr) — verify last recoat with the operator. Long-lifecycle assets show "Verify with owner".
Owner: AIR LIQUIDE×
5 results
| Asset | Type | Owner | Location | Contact | Coating due |
|---|---|---|---|---|---|
| AIR LIQUIDE - FREEPORT HYCO PLANT | Petrochem | AIR LIQUIDE | FREEPORT | — | Verify with owner |
| AIR LIQUIDE - LA PORTE ASU | Petrochem | AIR LIQUIDE | LA PORTE | — | Verify with owner |
| AIR LIQUIDE - LONGVIEW POX ASU PLANT | Petrochem | AIR LIQUIDE | LONGVIEW | — | Verify with owner |
| AIR LIQUIDE - SMR FACILITY | Petrochem | AIR LIQUIDE | PASADENA | — | Verify with owner |
| AIR LIQUIDE - VICTORIA ASU | Petrochem | AIR LIQUIDE | BLOOMINGTON | — | Verify with owner |
AIR LIQUIDE - FREEPORT HYCO PLANT
Verify with owner
Petrochem· AIR LIQUIDE· FREEPORT
AIR LIQUIDE - LA PORTE ASU
Verify with owner
Petrochem· AIR LIQUIDE· LA PORTE
AIR LIQUIDE - LONGVIEW POX ASU PLANT
Verify with owner
Petrochem· AIR LIQUIDE· LONGVIEW
AIR LIQUIDE - SMR FACILITY
Verify with owner
Petrochem· AIR LIQUIDE· PASADENA
AIR LIQUIDE - VICTORIA ASU
Verify with owner
Petrochem· AIR LIQUIDE· BLOOMINGTON
1–5 of 5