Browse assets
Filter 3 assets — sorted by most-overdue first. Coating status is a cycle-based prediction (e.g. tank battery ~12yr, steel bridge ~25yr) — verify last recoat with the operator. Long-lifecycle assets show "Verify with owner".
Owner: RODDY PRODUCTION×
3 results
| Asset | Type | Owner | Location | Contact | Coating due |
|---|---|---|---|---|---|
| RODDY PRODUCTION - CATERPILLAR G3304 NAHCR NO2086 | pipeline_gas | RODDY PRODUCTION | Multiple (Portable Facilities) | — | Verify with owner |
| RODDY PRODUCTION - CATERPILLAR G3306 TA LCR NO2159 | pipeline_gas | RODDY PRODUCTION | Multiple (Portable Facilities) | — | Verify with owner |
| RODDY PRODUCTION - COMPRESSOR NO112 | pipeline_gas | RODDY PRODUCTION | Multiple (Portable Facilities) | — | Verify with owner |
RODDY PRODUCTION - CATERPILLAR G3304 NAHCR NO2086
Verify with owner
pipeline_gas· RODDY PRODUCTION· Multiple (Portable Facilities)
RODDY PRODUCTION - CATERPILLAR G3306 TA LCR NO2159
Verify with owner
pipeline_gas· RODDY PRODUCTION· Multiple (Portable Facilities)
RODDY PRODUCTION - COMPRESSOR NO112
Verify with owner
pipeline_gas· RODDY PRODUCTION· Multiple (Portable Facilities)
1–3 of 3