Browse assets
Filter 2 assets — sorted by most-overdue first. Coating status is a cycle-based prediction (e.g. tank battery ~12yr, steel bridge ~25yr) — verify last recoat with the operator. Long-lifecycle assets show "Verify with owner".
Owner: TRANSWESTERN PIPELINE×
2 results
| Asset | Type | Owner | Location | Contact | Coating due |
|---|---|---|---|---|---|
| TRANSWESTERN PIPELINE - ATOKA NO1 COMPRESSOR STATION | pipeline_gas | TRANSWESTERN PIPELINE | ARTESIA | — | Verify with owner |
| TRANSWESTERN PIPELINE - GALLUP COMPRESSOR STATION | pipeline_gas | TRANSWESTERN PIPELINE | GALLUP | — | Verify with owner |
TRANSWESTERN PIPELINE - ATOKA NO1 COMPRESSOR STATION
Verify with owner
pipeline_gas· TRANSWESTERN PIPELINE· ARTESIA
TRANSWESTERN PIPELINE - GALLUP COMPRESSOR STATION
Verify with owner
pipeline_gas· TRANSWESTERN PIPELINE· GALLUP
1–2 of 2