Browse assets
Filter 2 assets — sorted by most-overdue first. Coating status is a cycle-based prediction (e.g. tank battery ~12yr, steel bridge ~25yr) — verify last recoat with the operator. Long-lifecycle assets show "Verify with owner".
Owner: CLEAR LAKE PLANT×
2 results
| Asset | Type | Owner | Location | Contact | Coating due |
|---|---|---|---|---|---|
| CLEAR LAKE PLANT | Petrochem | CLEAR LAKE PLANT | PASADENA | — | Verify with owner |
| CLEAR LAKE PLANT | Petrochem | CLEAR LAKE PLANT | PASADENA | — | Verify with owner |
CLEAR LAKE PLANT
Verify with owner
Petrochem· CLEAR LAKE PLANT· PASADENA
CLEAR LAKE PLANT
Verify with owner
Petrochem· CLEAR LAKE PLANT· PASADENA
1–2 of 2