Browse assets
Filter 3 assets — sorted by most-overdue first. Coating status is a cycle-based prediction (e.g. tank battery ~12yr, steel bridge ~25yr) — verify last recoat with the operator. Long-lifecycle assets show "Verify with owner".
Owner: TRANSCONTINENTAL GAS PIPE LINE CORP×
3 results
| Asset | Type | Owner | Location | Contact | Coating due |
|---|---|---|---|---|---|
| TRANSCONTINENTAL GAS PIPE LINE CORP - TRANSCO COMPRESSOR STATION 62 | pipeline_gas | TRANSCONTINENTAL GAS PIPE LINE CORP | GIBSON | — | Verify with owner |
| TRANSCONTINENTAL GAS PIPE LINE CORP - TRANSCO COMPRESSOR STATION 50 | pipeline_gas | TRANSCONTINENTAL GAS PIPE LINE CORP | EUNICE | — | Verify with owner |
| TRANSCONTINENTAL GAS PIPE LINE CORP - TRANSCO COMPRESSOR STATION 60 | pipeline_gas | TRANSCONTINENTAL GAS PIPE LINE CORP | JACKSON | — | Verify with owner |
TRANSCONTINENTAL GAS PIPE LINE CORP - TRANSCO COMPRESSOR STATION 62
Verify with owner
pipeline_gas· TRANSCONTINENTAL GAS PIPE LINE CORP· GIBSON
TRANSCONTINENTAL GAS PIPE LINE CORP - TRANSCO COMPRESSOR STATION 50
Verify with owner
pipeline_gas· TRANSCONTINENTAL GAS PIPE LINE CORP· EUNICE
TRANSCONTINENTAL GAS PIPE LINE CORP - TRANSCO COMPRESSOR STATION 60
Verify with owner
pipeline_gas· TRANSCONTINENTAL GAS PIPE LINE CORP· JACKSON
1–3 of 3