Browse assets
Filter 1 assets — sorted by most-overdue first. Coating status is a cycle-based prediction (e.g. tank battery ~12yr, steel bridge ~25yr) — verify last recoat with the operator. Long-lifecycle assets show "Verify with owner".
Owner: CITGO PETROLEUM CORP×
1 results
| Asset | Type | Owner | Location | Contact | Coating due |
|---|---|---|---|---|---|
| CITGO PETROLEUM CORP - LAKE CHARLES MANUFACTURING COMPLEX | Refinery | CITGO PETROLEUM CORP | SULPHUR | — | Verify with owner |
1–1 of 1