Browse assets
Filter 2 assets — sorted by most-overdue first. Coating status is a cycle-based prediction (e.g. tank battery ~12yr, steel bridge ~25yr) — verify last recoat with the operator. Long-lifecycle assets show "Verify with owner".
Owner: AMARILLO COMPRESSOR STATION×
2 results
| Asset | Type | Owner | Location | Contact | Coating due |
|---|---|---|---|---|---|
| AMARILLO COMPRESSOR STATION | pipeline_gas | AMARILLO COMPRESSOR STATION | AMARILLO | — | Verify with owner |
| AMARILLO COMPRESSOR STATION | pipeline_gas | AMARILLO COMPRESSOR STATION | BUSHLAND | — | Verify with owner |
AMARILLO COMPRESSOR STATION
Verify with owner
pipeline_gas· AMARILLO COMPRESSOR STATION· AMARILLO
AMARILLO COMPRESSOR STATION
Verify with owner
pipeline_gas· AMARILLO COMPRESSOR STATION· BUSHLAND
1–2 of 2