Browse assets
Filter 1 assets — sorted by most-overdue first. Coating status is a cycle-based prediction (e.g. tank battery ~12yr, steel bridge ~25yr) — verify last recoat with the operator. Long-lifecycle assets show "Verify with owner".
Owner: KOCH GATEWAY PIPELINE COMPANY×
1 results
| Asset | Type | Owner | Location | Contact | Coating due |
|---|---|---|---|---|---|
| KOCH GATEWAY PIPELINE COMPANY | pipeline_gas | KOCH GATEWAY PIPELINE COMPANY | NEEDVILLE | — | Verify with owner |
KOCH GATEWAY PIPELINE COMPANY
Verify with owner
pipeline_gas· KOCH GATEWAY PIPELINE COMPANY· NEEDVILLE
1–1 of 1