Browse assets
Filter 2 assets — sorted by most-overdue first. Coating status is a cycle-based prediction (e.g. tank battery ~12yr, steel bridge ~25yr) — verify last recoat with the operator. Long-lifecycle assets show "Verify with owner".
Owner: TRANSCONTINENTAL GAS PIPE LINE COMPANY LLC×
2 results
| Asset | Type | Owner | Location | Contact | Coating due |
|---|---|---|---|---|---|
| TRANSCONTINENTAL GAS PIPE LINE COMPANY LLC - COMPRESSOR STATION 65 | pipeline_gas | TRANSCONTINENTAL GAS PIPE LINE COMPANY LLC | GREENSBURG | — | Verify with owner |
| TRANSCONTINENTAL GAS PIPE LINE COMPANY LLC - COMPRESSOR STATION 65 | pipeline_gas | TRANSCONTINENTAL GAS PIPE LINE COMPANY LLC | GREENSBURG | — | Verify with owner |
TRANSCONTINENTAL GAS PIPE LINE COMPANY LLC - COMPRESSOR STATION 65
Verify with owner
pipeline_gas· TRANSCONTINENTAL GAS PIPE LINE COMPANY LLC· GREENSBURG
TRANSCONTINENTAL GAS PIPE LINE COMPANY LLC - COMPRESSOR STATION 65
Verify with owner
pipeline_gas· TRANSCONTINENTAL GAS PIPE LINE COMPANY LLC· GREENSBURG
1–2 of 2