Browse assets
Filter 2 assets — sorted by most-overdue first. Coating status is a cycle-based prediction (e.g. tank battery ~12yr, steel bridge ~25yr) — verify last recoat with the operator. Long-lifecycle assets show "Verify with owner".
Owner: OZONA COMPRESSOR STATION×
2 results
| Asset | Type | Owner | Location | Contact | Coating due |
|---|---|---|---|---|---|
| OZONA COMPRESSOR STATION | pipeline_gas | — | OZONA | — | Verify with owner |
| OZONA COMPRESSOR STATION | pipeline_gas | — | OZONA | — | Verify with owner |
OZONA COMPRESSOR STATION
Verify with owner
pipeline_gas· OZONA
OZONA COMPRESSOR STATION
Verify with owner
pipeline_gas· OZONA
1–2 of 2