Browse assets
Filter 2 assets — sorted by most-overdue first. Coating status is a cycle-based prediction (e.g. tank battery ~12yr, steel bridge ~25yr) — verify last recoat with the operator. Long-lifecycle assets show "Verify with owner".
Owner: PELICO PIPELINE LLC×
2 results
| Asset | Type | Owner | Location | Contact | Coating due |
|---|---|---|---|---|---|
| PELICO PIPELINE LLC - ARCADIA COMPRESSOR STATION | pipeline_gas | PELICO PIPELINE LLC | SIMSBORO | — | Verify with owner |
| PELICO PIPELINE LLC - DOWNSVILLE COMPRESSOR STATION | pipeline_gas | PELICO PIPELINE LLC | DOWNSVILLE | — | Verify with owner |
PELICO PIPELINE LLC - ARCADIA COMPRESSOR STATION
Verify with owner
pipeline_gas· PELICO PIPELINE LLC· SIMSBORO
PELICO PIPELINE LLC - DOWNSVILLE COMPRESSOR STATION
Verify with owner
pipeline_gas· PELICO PIPELINE LLC· DOWNSVILLE
1–2 of 2