Browse assets
Filter 1 assets — sorted by most-overdue first. Coating status is a cycle-based prediction (e.g. tank battery ~12yr, steel bridge ~25yr) — verify last recoat with the operator. Long-lifecycle assets show "Verify with owner".
Owner: TRANSCONTINENTAL GAS PIPE LINE CO., LLC×
1 results
| Asset | Type | Owner | Location | Contact | Coating due |
|---|---|---|---|---|---|
| TRANSCONTINENTAL GAS PIPE LINE CO., LLC - COMPRESSOR STATION 62 | pipeline_gas | TRANSCONTINENTAL GAS PIPE LINE CO., LLC | GIBSON | — | Verify with owner |
1–1 of 1