Browse assets
Filter 2 assets — sorted by most-overdue first. Coating status is a cycle-based prediction (e.g. tank battery ~12yr, steel bridge ~25yr) — verify last recoat with the operator. Long-lifecycle assets show "Verify with owner".
Owner: LOGAN DRAW BOOSTER×
2 results
| Asset | Type | Owner | Location | Contact | Coating due |
|---|---|---|---|---|---|
| LOGAN DRAW BOOSTER | pipeline_gas | LOGAN DRAW BOOSTER | ARTESIA | — | Verify with owner |
| LOGAN DRAW BOOSTER | pipeline_gas | LOGAN DRAW BOOSTER | ARTESIA | — | Verify with owner |
LOGAN DRAW BOOSTER
Verify with owner
pipeline_gas· LOGAN DRAW BOOSTER· ARTESIA
LOGAN DRAW BOOSTER
Verify with owner
pipeline_gas· LOGAN DRAW BOOSTER· ARTESIA
1–2 of 2