Browse assets
Filter 2 assets — sorted by most-overdue first. Coating status is a cycle-based prediction (e.g. tank battery ~12yr, steel bridge ~25yr) — verify last recoat with the operator. Long-lifecycle assets show "Verify with owner".
Owner: EXXONMOBIL PIPELINE×
2 results
| Asset | Type | Owner | Location | Contact | Coating due |
|---|---|---|---|---|---|
| EXXONMOBIL PIPELINE - NEW IBERIA STATION | pipeline_liquid | EXXONMOBIL PIPELINE | NEW IBERIA | — | Verify with owner |
| EXXONMOBIL PIPELINE - RED RIVER PARISH | pipeline_liquid | EXXONMOBIL PIPELINE | COUSHATTA | — | Verify with owner |
EXXONMOBIL PIPELINE - NEW IBERIA STATION
Verify with owner
pipeline_liquid· EXXONMOBIL PIPELINE· NEW IBERIA
EXXONMOBIL PIPELINE - RED RIVER PARISH
Verify with owner
pipeline_liquid· EXXONMOBIL PIPELINE· COUSHATTA
1–2 of 2