Browse assets
Filter 2 assets — sorted by most-overdue first. Coating status is a cycle-based prediction (e.g. tank battery ~12yr, steel bridge ~25yr) — verify last recoat with the operator. Long-lifecycle assets show "Verify with owner".
Owner: TENNESSEE GAS PIPELINE×
2 results
| Asset | Type | Owner | Location | Contact | Coating due |
|---|---|---|---|---|---|
| TENNESSEE GAS PIPELINE - COMPRESSOR STN 32 | pipeline_gas | — | JASPER | — | Verify with owner |
| TENNESSEE GAS PIPELINE - STATION 834 | pipeline_gas | TENNESSEE GAS PIPELINE | EXTENSION | — | Verify with owner |
TENNESSEE GAS PIPELINE - COMPRESSOR STN 32
Verify with owner
pipeline_gas· JASPER
TENNESSEE GAS PIPELINE - STATION 834
Verify with owner
pipeline_gas· TENNESSEE GAS PIPELINE· EXTENSION
1–2 of 2