Browse assets
Filter 1 assets — sorted by most-overdue first. Coating status is a cycle-based prediction (e.g. tank battery ~12yr, steel bridge ~25yr) — verify last recoat with the operator. Long-lifecycle assets show "Verify with owner".
Owner: NATURAL GAS PIPELINE OF AMERICA×
1 results
| Asset | Type | Owner | Location | Contact | Coating due |
|---|---|---|---|---|---|
| NATURAL GAS PIPELINE OF AMERICA - COMPRESSOR STATION # 801 | pipeline_gas | NATURAL GAS PIPELINE OF AMERICA | RATLIFF CITY | — | Verify with owner |
1–1 of 1