← All facilities

ALCOA MINE RD over CR 312

Private (other than railroad)·bridge·0.4 MI N OF CR 309, TX·map ↗
Monitor · est. window 2030
confidence 0.45

NBI age 21yr — steel bridge repaint cycle ~25yr

👤 Asset owner contacts

This facility isn't linked to a parent operator yet, so no contacts are attached. (Operator links come from EPA owner + SEC matching.)

🎯 Predicted turnaround windows

No predictions yet — run scripts/run_predictions.py after ingesting events.

🔥 Regulatory timeline (0)

    💰 Capex signals (0)

    No capex signals found for this facility yet.