← All facilities

FM 3131 over Palmetto Dam Spillway

Other State Agencies·bridge·0.9 MI S of FM 1822, TX·map ↗
⛔ Coating likely OVERDUE · est. window 2006
confidence 0.45

NBI age 45yr — past first 25-yr repaint cycle; verify recoat history with owner

👤 Asset owner contacts

This facility isn't linked to a parent operator yet, so no contacts are attached. (Operator links come from EPA owner + SEC matching.)

🎯 Predicted turnaround windows

No predictions yet — run scripts/run_predictions.py after ingesting events.

🔥 Regulatory timeline (0)

    💰 Capex signals (0)

    No capex signals found for this facility yet.