← All facilities

NATURAL GAS PIPELINE RIGHT OF WAY, MILE POST 145.1

NATURAL GAS PIPELINE RIGHT OF WAY, MILE POST 145.1·pipeline_gas·1400 FT W OF US 18 ON CR 908 AT NATURAL GAS ROW, SINTON, SAN PATRICIO, TX
EPA 110070595663NAICS 486210
Monitor
confidence 0.30

Gas pipeline — PHMSA integrity reassessment ~7yr; above-ground recoat per operator schedule

👤 Asset owner contacts NATURAL GAS PIPELINE RIGHT OF WAY, MILE POST 145.1

No contacts ingested for this operator yet.

🎯 Predicted turnaround windows

No predictions yet — run scripts/run_predictions.py after ingesting events.

🔥 Regulatory timeline (0)

    💰 Capex signals (0)

    No capex signals found for this facility yet.