← All facilities

G12LT CDP

G12LT CDP·pipeline_gas·GO SOUTH FROM CATARINA ON HWY 83, 16.2 MILES TO THE GALVAN RANCH MAIN ROAD. TURN LEFT ON GALVIN RANC, CATARINA, WEBB, TX
EPA 110070059744NAICS 486210
Monitor
confidence 0.30

Gas pipeline — PHMSA integrity reassessment ~7yr; above-ground recoat per operator schedule

👤 Asset owner contacts G12LT CDP

No contacts ingested for this operator yet.

🎯 Predicted turnaround windows

No predictions yet — run scripts/run_predictions.py after ingesting events.

🔥 Regulatory timeline (0)

    💰 Capex signals (0)

    No capex signals found for this facility yet.