G12LT CDP
G12LT CDP·pipeline_gas·GO SOUTH FROM CATARINA ON HWY 83, 16.2 MILES TO THE GALVAN RANCH MAIN ROAD. TURN LEFT ON GALVIN RANC, CATARINA, WEBB, TX
EPA 110070059744NAICS 486210
Monitor
confidence 0.30
Gas pipeline — PHMSA integrity reassessment ~7yr; above-ground recoat per operator schedule
👤 Asset owner contacts — G12LT CDP
No contacts ingested for this operator yet.
🎯 Predicted turnaround windows
No predictions yet — run scripts/run_predictions.py after ingesting events.
🔥 Regulatory timeline (0)
💰 Capex signals (0)
No capex signals found for this facility yet.