← All facilities

SH 14-14- LM 14.3 over DRAINAGE DITCH

State Highway Agency (ARDOT)·bridge·4SH 14, AR·map ↗
⛔ Coating likely OVERDUE · est. window 2013
confidence 0.45

NBI age 38yr — past first 25-yr repaint cycle; verify recoat history with owner

👤 Asset owner contacts

This facility isn't linked to a parent operator yet, so no contacts are attached. (Operator links come from EPA owner + SEC matching.)

🎯 Predicted turnaround windows

No predictions yet — run scripts/run_predictions.py after ingesting events.

🔥 Regulatory timeline (0)

    💰 Capex signals (0)

    No capex signals found for this facility yet.