← All facilities

I 49(N TO E RAMP) over I40(BELOW)/I49(ABOVE)

State Highway Agency (ARDOT)·bridge·JCT OF I-40/I 49, AR·map ↗
⛔ Coating likely OVERDUE · est. window 2014
confidence 0.45

NBI age 37yr — past first 25-yr repaint cycle; verify recoat history with owner

👤 Asset owner contacts

This facility isn't linked to a parent operator yet, so no contacts are attached. (Operator links come from EPA owner + SEC matching.)

🎯 Predicted turnaround windows

No predictions yet — run scripts/run_predictions.py after ingesting events.

🔥 Regulatory timeline (0)

    💰 Capex signals (0)

    No capex signals found for this facility yet.