← All facilities

I-55/Sec-11/L-7.3 over I-40/Sec-52Y/L-277.19

State Highway Agency (ARDOT)·bridge·97.39 Mi West Tenn St Lin, AR·map ↗
⛔ Coating likely OVERDUE · est. window 2013
confidence 0.45

NBI age 38yr — past first 25-yr repaint cycle; verify recoat history with owner

👤 Asset owner contacts

This facility isn't linked to a parent operator yet, so no contacts are attached. (Operator links come from EPA owner + SEC matching.)

🎯 Predicted turnaround windows

No predictions yet — run scripts/run_predictions.py after ingesting events.

🔥 Regulatory timeline (0)

    💰 Capex signals (0)

    No capex signals found for this facility yet.