← All facilities

Sh-38/Sec-10/L0.3 over I-55/Sec-11/L-3.92/L0.31

State Highway Agency (ARDOT)·bridge·10.5 Miles South Jct I-40, AR·map ↗
⛔ Coating likely OVERDUE · est. window 2012
confidence 0.45

NBI age 39yr — past first 25-yr repaint cycle; verify recoat history with owner

👤 Asset owner contacts

This facility isn't linked to a parent operator yet, so no contacts are attached. (Operator links come from EPA owner + SEC matching.)

🎯 Predicted turnaround windows

No predictions yet — run scripts/run_predictions.py after ingesting events.

🔥 Regulatory timeline (0)

    💰 Capex signals (0)

    No capex signals found for this facility yet.