← All facilities

2270C over KIZER CREEK

County Highway Agency·bridge·4.4 S 7.7 E OF VICI, OK·map ↗
⛔ Coating likely OVERDUE · est. window 2010
confidence 0.45

NBI age 41yr — past first 25-yr repaint cycle; verify recoat history with owner

👤 Asset owner contacts

This facility isn't linked to a parent operator yet, so no contacts are attached. (Operator links come from EPA owner + SEC matching.)

🎯 Predicted turnaround windows

No predictions yet — run scripts/run_predictions.py after ingesting events.

🔥 Regulatory timeline (0)

    💰 Capex signals (0)

    No capex signals found for this facility yet.